How To Establish Solar Power Plant?

Investigate the most pressing needs in your area. In some local markets, some solar niches have reached saturation. While some solar companies offer many products or services, the majority concentrate on a sector that is underserved and in which they specialize.

Is it possible for me to start a solar power plant?

Solar farms require space to install the panels. As a result, land is necessary to get started. A common issue is how much land is needed for a 1 MW solar power facility. To begin, you’ll need at least 15 acres of property.

What are the fundamental specifications for a solar power plant?

One of the most technologically possible and cost-effective ways to produce pollution-free, sustainable power is to harness the sun’s energy and convert it to electricity. Long-term planning for efficient and responsible project development is required to generate electricity at the scale required to meet aggressive carbon emission reduction objectives.

Responsible Land Use

In the United States, there is enormous potential for solar power generation. Enough sunlight shines on the continental United States in five minutes to meet our full month’s electrical needs. The Southwest of the United States has an abundance of high-quality resources for utility-scale solar electricity. According to research from the National Renewable Energy Laboratory, utility-scale solar could power the whole United States while taking up only 0.6 percent of the country’s land mass.

A utility-scale solar power facility may require between 5 and 10 acres per megawatt (MW) of generating capacity, depending on the technology. Solar power plant development, like fossil fuel power station development, necessitates some land grading and vegetation clearing. Many concentrated solar power (CSP) plants, for example, must be built on flat terrain with a slope of less than 1%. Utility-scale photovoltaics, on the other hand, can be installed on land with higher slopes and no access to water.

In India, how much does it cost to build a solar power plant?

Photovoltaic panels are used to generate energy at the Solar Power Plant. Solar panels generate direct current electricity here. As a result, a solar inverter is required to transform this energy into an alternating current suitable for household or industrial use.

Area needed for the construction of a 5 MW solar energy power plant in India

It is vital to study the size of land required for the building of a Solar Plant before proceeding.

  • Because vast arrays of photovoltaic panels must be exposed to sunlight, solar plants require a lot of room.
  • Solar Power Plants require at least 5 acres of land every 1 MW of production, so a 25-acre area is required to generate 5 MW of energy.

However, picking a site isn’t enough. The project’s development also necessitates legal approval. Furthermore, environmental, safety, and health authorities must approve your project.

Cost of land for construction of 5 MW solar plant

  • The price of land is Rs.5 lakh per acre (1MW plant requires a minimum of 5 acres of land).
  • The projected land cost per acre is Rs.5 lakhs. For a 1 MW plant, a minimum of 5 acres of land is required, implying that a 5 MW Solar Power Plant will cost Rs. 1 crore 25 lakh.
  • Grid extension might cost up to Rs. 15 lakh per kilometer, depending on the capacity of the extension lines (range- 11kV to 123kV). As a result, the cost of grid extension is determined by the distance between the location and the nearest substation.
  • If trackers are utilized in the power plant, an additional Rs. 2 crore (Rs. 40 lakh/MW) is added to the project cost.

Taking all of these considerations into account, a 1 MW Solar Plant will cost around Rs. 4 crore to build, implying that a 5 MW Solar Plant will cost around Rs. 20 crore to build.

Profit earned by a 5 MW solar plant in India?

In India, the cost of a 5MW plant is expected to be between 34.5 and 35 crores. Thus, Rs.45,000 to 60,000 can be generated everyday with 20k – 20.5k units of power. As a result, after deducting minor O&M costs, a total profit of Rs 1.75 crores can be expected after a year.

Due to the national average of four peak sun hours per day, a 5 MW solar plant would produce 6000 MWh per year. As a result, a 5 MW Solar Plant can generate annual revenue of between Rs. 1.5 and 1.75 crores.

You might also be interested in this article: How Much Electricity Does a 1MW Solar Power Plant Produce in a Month?

Is it possible to make money from a solar farm?

Solar farms can be quite successful across a wide range of price points, ranging from $20000 to $60000 per acre. It truly depends on a thorough examination of each unique property.

The essential prerequisites for any developer intending to build a solar energy plant are level land with no shade and a good irradiance value in the region.

Due to economies of scale throughout the acquisition and construction phases, larger farms yield higher financial profits. Profits would increase as the number of acres increased, but the capital costs may be in the millions of dollars.

What is the size of a solar farm?

Due to the increasing affordability of solar PV technology and the rising cost of electricity from the grid, the number of commercial-scale solar installations has increased dramatically in Australia. Utility-scale, multi-megawatt (MW) solar projects are also expected to increase in quantity in the near future, as more banks, corporations, local governments, and individuals see them as a good investment option.

Solar farms are typically ground-mounted and start at roughly 500 kilowatts (kW, 1MW = 1,000kW), with no fixed capacity limit, though systems larger than 5MW are still notable rarity in Australia. As a general rule, a 1MW solar farm will take up about 2-3 hectares of land.

Large-scale generation certificates (LGCs), which provide an ongoing cash stream for the project’s owner/investors, are available for solar systems with a capacity of over 100kW. Additionally, the project developer and enterprises or other organizations with high energy demand may negotiate conditions for a power purchase agreement (PPA).

1MW solar equals how many acres?

Most solar farms range in size from 0.5 MW to 15 MW, with a few bigger projects on low-grade or brownfield land of 30-50 MW. Developers and installers typically require roughly 2 hectares of land (5 acres) per megawatt of power.

How much land does a solar farm need?

According to GTM Research, a 1 MW solar farm requires 68 acres to accommodate all of the equipment and space between panel rows.

Keep in mind that large solar projects require more than just space for the solar arrays. In addition to land, allied equipment like as inverters must be housed, and space must be left between rows of solar panels for repair and maintenance access.

How long does it take to build a solar farm?

Construction of a solar farm can be completed in a matter of months, depending on the scale of the project and the amount of people working on it.

However, securing a location and obtaining a permission is even more difficult. A solar farm can take 35 years to get all of the relevant approvals and contracts in place.

After a solar farm is installed and operational, it requires little maintenance and only needs to be maintained 34 times each year.

How much money can you make with a solar farm?

Selling the electricity generated by a 1 MW solar farm can bring in around $40,000 per year in revenue.

Purchase-Power Agreements (PPAs) are used by utility-scale solar farms to sell their power on the wholesale electricity market. Electricity marketplaces like LevelTen Energy can help with this.

Solar power traded at $29.75 per MWh in Q4 2021, according to LevelTen Energy’s P25 national index. The P25 index indicates that the 25th percentile of PPAs sold for less than this, while the 75th percentile sold for more, and is thus a conservative value.

We know that a 1 MW solar farm would produce 1,460 MWh per year based on the national average of four peak sun hours each day. That means the average 1 MW solar farm can anticipate to earn around $43,500 per year in revenue.

These are, of course, average values. The amount of money you make depends on a variety of things, including the amount of solar power produced in your location and the wholesale rate for solar energy.

Furthermore, keep in mind that PPA values vary widely depending on wholesale electricity rates in your Regional Transmission Organization’s area.

In India, how much money does a 1 MW solar farm generate?

The revenue from a solar plant is calculated by multiplying the units generated by the plant over the course of a year by the tariff in effect at the plant’s location. The number of units produced in a given year may be found in the table below.

CUF can be determined by looking at the performance of other plants in the area using data published by MNRE on a regular basis. It’s crucial to factor in a 0.5 percent reduction in solar plant output after a year. So, when calculating revenue from a solar plant over a 20-year period, this degradation factor must be taken into account.

  • Land, components, installation, preparatory and preoperative charges are all included in the initial price.
  • Debt payment, taxes, tax savings through accelerated depreciation, and interest are all part of the financing costs.

When discussing the return on investment for solar power systems, it’s important to be clear about what we’re talking about. Because one of the following scenarios could result in a return:

  • Annual returns (as a percentage) over the project’s lifetime: The returns can be estimated using the revenue illustration shown above.

Internal rate of return is a financial metric used in cash flow analysis and is frequently used to forecast an investment’s health. The quantity and time value of returns are contrasted against the costs connected with a project using this metric. We must first comprehend the idea of Net Present Value before diving into the Internal Rate of Return of a utility-scale solar power facility (NPV). By predicting how much value money loses over time, NPV brings the future cash flow to its current worth (present value).

The IRR is the discount factor that reduces the net present value of cash flows to zero. It’s always given as a percentage.

When a project is financed with both equity and debt, we must examine the equity IRR as well as the project IRR.

  • The project IRR is calculated by dividing the internal rate of return by the project cash flows (excluding financing cash flows), whereas the equity IRR is calculated by dividing the internal rate of return by the cash flows net of financing.
  • The equity IRR is the percentage of a project’s return to equity capital providers. Equity IRR is always larger than project IRR for profitable investments. If the equity share of the investment is raised, the equity IRR will decrease as the leverage supplied by debt decreases. If no debt exists, the equity IRR is the same as the project IRR.
  • Equity Payback Period (in Years): Equity Payback Period is also calculated to get a sense of a project’s financial sustainability. The lesser the payback, the more appealing the project. It is calculated by dividing the project’s initial investment expenses by the project’s annual cash flow. However, this isn’t always the case. If the cash flows are unequal, we add up the annual cash flows till the payback period is determined.

The time it takes to recoup a project’s investments from the revenues it generates is referred to as the payback period. Consider a solar power plant with a capacity of 1 MW. In India, a 1 MW plant would cost 6.5-7 crores in capital. The system would produce between 4000 and 4500 units of power per day. After modest O&M costs, the electricity generated might fetch up to 25000-30000 rupees per day, and around Rs 1 crore per year. This implies that the payback period will be around 7 years.

Solar power plants have a lifespan of 20 to 25 years. Even though it takes 7 years to recoup the initial investment, the project lifespan is nearly 20 years after this payback period.

Please note, however, that for large projects such as MW-scale solar plants, the Payback Period concept is not often used by finance professionals. Internal rate of returns, or IRRs, are the financial measures used for these. The Project IRR and the Equity IRR are the two most common IRRs utilized as measurements.

The returns that can be expected from a solar power installation are influenced by a number of factors. The following are the most important factors:

  • Tariff rates: The greater the tariff rates, the higher the project’s returns. The tariff rates are determined by the PPAs that the plant owner has been awarded, as well as the policy that the solar plant is registered under. Most state solar rules differ, and as a result, the tariff rates at which you can sell the generated electricity differ as well. Going with a 3rd party PPA can sometimes result in higher tariff rates, but it also comes with the danger that most 3rd party PPAs are for a shorter amount of time than the standard 25 years for PPAs with government agencies.
  • Annual Generation: The annual generation (in units) obtained from a solar plant is exactly proportional to the returns. This can be achieved by not compromising on the quality of plant-related components. Furthermore, penalty provisions may be included in signed PPAs for shortfalls or excesses in planned plant generation. As a result, in order to improve generation, the plant owner must ensure optimal generation from the facility.
  • Investments: A good debt-to-equity ratio is a key aspect in getting a good return on a solar project. Because there are no loan interests to pay, a project wholly supported by equity (self-financed or with investor capital) might yield higher profits. However, this entails a considerable level of risk and is rarely used in MW-scale installations.
  • Government incentives: Obviously, government incentives can have a favorable impact on the returns connected with a solar facility. Accelerated Depreciation projects have a greater Internal Rate of Return than those that do not. Furthermore, projects that qualify for capital subsidies and tax holidays recover their investments faster than those that do not.

Aside from the basic elements that influence project returns, there are other factors to consider, such as:

  • Evacuation capability of nearby substations: Evacuation capacity refers to a substation’s ability to receive and transport power supplied by a plant to the grid. If the substation does not have enough capacity at all times, the power generated by the plant will not be evacuated. There will be no money from this power that has not been evacuated.
  • Equipment efficiency: Ensuring the quality of project components, including as inverters, modules, electrical infrastructure, and other equipment, can have a substantial impact on the solar power plant’s returns.
  • Proper Plant Operations and Maintenance: In order to maximize the plant’s generation, it must be adhered to the plant’s standard operations and periodic maintenance methods.

Solar Mango forecasts that solar farm projects have project and equity IRRs in the range of 15-20 percent for 25 years, and project IRRs in the range of 10-15 percent, based on global patterns as of 2015. For most projects, the equity payback period is between 7 and 10 years. The IRRs will lean to the upper end of the range and the payback times will go to the lower end of the range for projects with substantially higher incentives than usual.

  • In India, what is the Internal Rate of Return and Break-Even Point for Utility-Scale Solar?
  • What are the costs of an initial investment and operation and maintenance for a MW solar plant in India? What Kind of Financial Returns Should We Expect?

What is the size of a 1 megawatt solar farm?

A 1 watt solar power plant requires around 100000 square feet, or 2.5 acres. Because large ground-mounted solar PV farms require space for other accessories, a 1 MW solar power plant will require approximately 4 acres of land.